CMMC Phase 2 is suspended, not cancelled. On July 13, 2026 the Department of Defense paused the stage of the Cybersecurity Maturity Model Certification program that would have required independent third-party assessments for Level 2 contractors starting November 10, 2026, and opened a 60-day reform review. On September 3 a class deviation turned that pause into binding contract regulation. What did not change is the part that actually costs money: if your contract carries DFARS 252.204-7012, you still owe all 110 controls in NIST SP 800-171, a current score in the Supplier Performance Risk System, and an annual affirmation signed by a named executive.

CMMC is the Department of Defense's program for verifying that contractors and subcontractors protect the sensitive but unclassified information the government hands them. It does not invent new security requirements. It checks whether a company actually implemented the ones it has been contractually promising since 2017. Phase 1, which began in November 2025, relies on self-assessment. Phase 2 was supposed to add an outside assessor for companies handling Controlled Unclassified Information. That outside assessor is what got suspended. The promise did not.

What actually happened, in order

The timeline matters because half the advice circulating right now is based on the headline, not the paperwork.

What is still required today

Every one of these was in force before CMMC existed and is in force now. Pull your contracts and check the clause list rather than assuming.

The exposure nobody advertised: an inaccurate SPRS score is a false statement to the federal government. The Department of Justice has been collecting civil cyber-fraud settlements from contractors that overstated their NIST 800-171 compliance, including a roughly $500,000 settlement in June 2026 over an inaccurate self-assessment. The suspension did not touch the False Claims Act. If your posted score was an estimate, the pause is the cheapest moment you will ever get to correct it.

Why this lands harder in Ohio than most states

Central and Southwest Ohio have one of the densest defense supply chains in the country, and it is getting denser. Wright-Patterson Air Force Base in Dayton anchors the Air Force's research and acquisition commands. The Defense Supply Center Columbus in Whitehall is headquarters for DLA Land and Maritime, the agency that buys spare parts for ground vehicles and ships from thousands of small machine shops and distributors. And Anduril's Arsenal-1 plant in Pickaway County, which the state describes as the largest single job-creation project in Ohio history at more than 4,000 jobs by 2035, started producing autonomous aircraft in the spring of 2026.

Every one of those anchors pulls in tier-two and tier-three suppliers: the 30-person shop in Grove City that machines a bracket, the electronics distributor in Beavercreek, the coatings company in Springfield. Those are the businesses that received a purchase order with a DFARS clause attached, checked a box, and have never been asked to prove anything. The prime contractors feeding Arsenal-1 and Wright-Patt are now mapping their supply chains down to raw materials under Executive Order 14415, signed July 20, 2026, and a supplier with a shaky security story is a supplier that gets replaced quietly.

The two mistakes suppliers are making right now

Mistake one: treating the pause as permission to stop

Companies that were halfway through a remediation project are pausing it, laying off the consultant, and telling themselves they will restart when the rule settles. Two problems. The controls that take the longest to implement, centralized logging with retention, multi-factor authentication on every path into the network, a tested incident response plan, take six to twelve months to do properly. And the reform review can only change verification. Under every scenario the task force has floated, the 110 controls stay.

Mistake two: spending on the certificate instead of the controls

The opposite error is paying for readiness theater. Booking assessor time, buying a compliance platform subscription, and generating a 200-page System Security Plan that describes controls the company has not actually deployed. When verification comes back in whatever form, the plan will not save you. The implemented control will.

A practical test: if your IT provider cannot show you, on a screen, that MFA is enforced on every remote access path, that logs from every CUI system are being collected and kept, and that CUI is encrypted with FIPS-validated modules, you do not have a compliance program. You have a document. That is true whether Phase 2 resumes in six months or never.

How to use the pause instead of wasting it

  1. Confirm which clauses are actually in your contracts. Pull every active DoD prime and subcontract and check for DFARS 252.204-7012, 252.204-7019, 252.204-7020, and any CMMC clause. The clauses, not the news cycle, define what you owe.
  2. Re-score yourself against all 110 controls honestly. Use the DoD assessment methodology, record the real score, and write a dated Plan of Action and Milestones for every gap. An honest 70 with a credible plan is defensible. An invented 110 is a liability.
  3. Fix your SPRS score if it does not match reality. See the callout above. This is the one item on this list with personal legal exposure attached.
  4. Scope and isolate where CUI actually lives. Most small manufacturers let CUI sprawl across email, shared drives, the quoting system, and the shop-floor PC that runs the CNC. Pull it into a defined enclave, segment that enclave from the production network and general office traffic, and you shrink the assessment boundary and the attack surface at the same time. Our guide to network segmentation for manufacturing SMBs walks through how that looks on a real shop floor.
  5. Close the slow controls first. MFA everywhere, centralized logging with retention, FIPS-validated encryption, and an incident response plan you have actually rehearsed against the 72-hour reporting clock. These are the items that cannot be finished in the month before an assessor shows up.
  6. Ask your primes what they expect, in writing. Their supplier questionnaire is the requirement that determines whether the next purchase order arrives. Get their current expectation documented so a paused federal rule does not become a lost customer.

What a manufacturing-focused IT partner does differently here

A general IT provider will run antivirus, back up the file server, and answer the helpdesk phone. A provider that works with defense suppliers maps each of the 110 controls to a specific configuration in your environment, keeps the evidence that the control is operating, segments CUI from the OT network without taking a production line down to do it, and hands your named official something they can sign without holding their breath. That is the work SkyNet's manufacturing IT practice does for Ohio shops, and it is the same work our vCISO service supervises when a company needs someone to own the program rather than just the tooling. If you want the broader picture of what manufacturing IT support covers beyond compliance, start with our guide to IT support for manufacturing companies in Columbus.

The suspension bought Ohio's defense suppliers time. Time is only worth something if it gets used on the controls that were required before CMMC, are required during the pause, and will be required after it.

Frequently asked questions

Is CMMC cancelled or just paused?
CMMC is paused, not cancelled. On July 13, 2026 the Department of Defense suspended Phase 2, the stage that would have required independent third-party assessments for Level 2 starting November 10, 2026, and launched a 60-day reform review. On September 3, 2026 a class deviation made that suspension binding contract regulation. NIST SP 800-171 and the DFARS 252.204-7012 safeguarding clause were never suspended and still apply to every contract that carries them.
Do I still have to comply with NIST SP 800-171 while CMMC Phase 2 is suspended?
Yes. If your contract contains DFARS 252.204-7012, you are contractually required to implement all 110 controls in NIST SP 800-171 Revision 2, report cyber incidents to the DoD within 72 hours, post a current self-assessment score in SPRS, and have a named official affirm that score annually. The suspension removed the third-party verification step, not the requirement.
What happens if my SPRS score is wrong?
An inaccurate SPRS score is treated as a false certification to the government. The Department of Justice has already collected civil cyber-fraud settlements from contractors that overstated their NIST 800-171 compliance, including a roughly $500,000 settlement in June 2026. DIBCAC also spot-checks posted scores. A score that was estimated rather than measured should be corrected now.
Should an Ohio defense supplier keep spending on CMMC readiness during the pause?
Yes, but spend it on the controls, not on scheduling a certification. The 110 NIST 800-171 controls are the baseline under every version of CMMC ever proposed, and the reform review is about how compliance is verified, not what compliance means. Work done now on MFA, logging, encryption, CUI scoping, and incident response counts under whatever the task force recommends, and it is what your prime contractors are asking about today.
When will CMMC Phase 2 resume?
No new date has been set. The CMMC Reform Task Force's 60-day review ended September 11, 2026, and its findings go to the DoD Chief Information Officer, who decides what to make public. Industry expects a public report in late September or early October 2026. Until a new rule or deviation is issued, third-party assessment requirements stay out of solicitations and contracts.
CB

Chip Bell

Founder & CEO, SkyNet MTS

Chip Bell has been building and running managed IT and cybersecurity programs for Ohio businesses for more than 20 years. SkyNet MTS supports Columbus and Dayton-area manufacturers and defense suppliers with NIST 800-171 implementation, CUI enclave design, and vCISO oversight, and is based in Columbus, Ohio.

Get a straight read on your NIST 800-171 posture

We'll score your environment against the 110 controls the way a DIBCAC assessor would, tell you what your SPRS number should actually be, and lay out the slow controls to start on first. No slides, no sales pressure.

Schedule Your Free Assessment